MoPac Trail East
Trail Description
The rural portion of the MoPac Trail starts at 84th Street and continues east through Walton, Eagle, Elmwood and ends near Wabash
Trail Details
-
Surface Type:Crushed Limestone
-
Length:21.67 miles
-
Other trail connections:Paralleling the trail from 98th Street to Elmwood, an undeveloped path for horseback riding is clearly marked along the MoPac trail
-
Points of Interest:Water fountain available at Walton trail head, Eagle, Wabash