Skip to main content

Trails

David Murdock Trail

David Murdock Trail

David Murbosck Trail

Trail Description

The Murdock Trail connects to the east end of the Dietrich trail at 48th and Fremont Streets and continues on along the north edge of Mahoney park out to 112th Street.

Trail Details

  • Surface type:Crushed limestone (some paved)

  • Length:4.73 miles

  • Other trail connections:Connects to John Dietrich Trail, 84th Street Trail

  • Major street below grade crossing or bridge:Bridge over 84th Street

  • Points of Interest:Mahoney Park, Ballard Park, Havelock

MENU CLOSE